Skip to content
For colleges

Run real labs for a whole department.

DeployU becomes your college's own lab platform — your subdomain, your roster, your semester map. Students get per-student real environments; faculty get verified lab reports instead of screenshots; the institution gets outcome data and no cloud bill.

All active sessions · 23

StudentCourseStepElapsedStatus
24B91A5442Docker · 14 / 731 mverifying
24B91A5418Docker · 13 / 734 mstuck 9 m
24B91A5471Linux · 26 / 922 mworking
24B91A5403Docker · 13 / 740 m3 fails
24B91A5456Kubernetes · 12 / 812 mworking
24B91A5429Docker · 17 / 748 mdone
Just finished · last 30 min: 6 students · avg 47 m

Step failure hotspots · last 30 days

Docker · 1 — step 3 inspect a container41 failsmost common: used docker ps without -a
Linux · 2 — step 5 permissions27 failschmod applied to the wrong path
Kubernetes · 1 — step 4 expose a service19 failsNodePort vs ClusterIP confusion

Hotspots tell faculty what to re-teach on Monday — drawn from verifier failures, not from a survey.

Lab mastery · CSE III-II · Section B · Docker · 1

StudentRollMasteredAttemptedHoursCO
Ananya Rao54427 / 773.42 / 2
Karthik N54185 / 774.11 / 2
Sravya P54717 / 772.82 / 2
Mohan K54032 / 741.20 / 2
Divya S54566 / 773.01 / 2
Rahul V54297 / 795.22 / 2
62 students · section average 5.6 / 7 mastered · 3.1 practice hours

Lab activity · this week

48practised this week
9stuck on one step
5never started a lab
Attendance
91%
Lessons mastered
80%
Quiz accuracy
74%

"Monday list": the 14 students to talk to first, built from stuck + never-started + failing verifies.

CO attainment · Docker · 1 — Container Foundations

CO1 · run & inspect
88%
CO2 · images & registries
81%
CO3 · networking
64%
CO4 · persistence
71%

CO–PO mapping matrix

PO1
PO2
PO3
PO4
PO5
PO12
CO1
3
2
3
1
CO2
2
3
1
3
1
CO3
2
2
3
1
2
CO4
1
2
3
2
2
1

Attainment trend · 4 semesters

22-2323-2424-2525-26

Lesson → CO → PO is mapped once per course; attainment is computed from verified tasks, so the outcome report is evidence, not an estimate. Export as PDF for NBA / NAAC.

Cohort readiness distribution · CSE IV-I · 184 students

0102030405060708090+

Readiness by branch

CSE
58
AI & DS
63
IT
49
ECE
41

Company drive shortlist · Infosys · 9 Sep

StudentReadyPack
Ananya Rao7836 / 42
Rahul V7431 / 42
Sravya P7133 / 42
Divya S6627 / 42
+ 57 above cut-off≥ 60

Cohort priority topics

Dynamic programmingGraphsSQL joins
Lab reportCSE · III-II · Docker · 1 — Container Foundations24B91A5442
Ananya RaoCompleted 14 Aug · 52 min · 2 verify retries
7 / 7 verified
Proof of workcommands run in the lab, captured from the shell log
41 commands
Course outcomesCO2 · CO4 mapped to PO1, PO3, PO5
CO 2/4
Instructor / HoD reviewSatisfactory · signed 16 Aug
Section heatmap · 62 students · task completion
What faculty get

Grade from evidence, not from a PDF of screenshots.

  • Lab reports per studentWhich tasks verified, when, how many attempts, what they typed. One click to PDF.
  • Class monitorWho's stuck on which task, live, during the lab hour — and the hotspots to re-teach.
  • CO / PO mappingEvery course mapped to outcomes; attainment computed from verified work and exported for accreditation.
  • Roster from your ERPStudents, sections and semesters synced; nobody types a spreadsheet.
How a rollout works

Four weeks from signature to first lab hour.

We've done this with engineering colleges running thousands of students on the platform. The sequence is the same every time.

Week 1

Tenant + roster

Your subdomain goes live. Students and sections are loaded from your ERP export or API.

Week 2

Semester map

Courses mapped to branches and semesters with your faculty; CO/PO attached.

LinuxDockerK8sAWSReactJavaPythonAI
Week 3–4

Pilot lab hours

Two sections run real labs with us in the room. Reports reviewed with HoDs. Then the whole department.

Request a demo

Thirty minutes, your lab on screen.

We'll run a lab live for your faculty, show a real lab report and the admin dashboards, and price it for your student count. Reply within one working day.